Shanghai Fengxian Equipment Vessel Factory

Ingenious Intelligent Manufacturing, Create a Centennial Brand

Home ProductsHeat Exchange Equipment

Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment

Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment

  • Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment
  • Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment
Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment
Product Details:
Place of Origin: Shanghai China
Brand Name: Shenjiang
Certification: ISO BV SGS CE ASME
Model Number: SJ-1.0-4.0
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: plywood packing for each tank
Delivery Time: 15 days after received payment
Payment Terms: D/A, D/P, L/C, T/T, Western Union, MoneyGram
Supply Ability: 2000 sets one month
Contact Now
Detailed Product Description
Material: Carbon Steel Q345R Volume: 0.9M3
Pressure: 232psi Operating Temperature: Room Temperature
Orientation: Horizontal Height: Customized
Tank Diameter: 600
High Light:

heat transfer equipment

,

industrial heat exchanger

1. Overview

 

The water dispenser is a water flow distribution and assembly device that is made up of a water collector and a water separator. The water separator is a device that divides all the way through a container into several outputs, and the water collector is a device that outputs multiple inputs through a container. It manages a number of branch pipelines, including the backhaul branch and water supply slip, which is mostly DN350-DN1500 range, with carbon steel or stainless steel plate, is a professional manufacturer of pressure vessels, which need to install the pressure gauge thermometer The It is the first side of the main pipe water flow distribution as needed to ensure that the regional branch loop flow to meet the load needs, but also the flow of the branch circuit pool, and input back to the main pipe to achieve the cycle of operation. Its backwater reuse, can achieve more energy-efficient effect, can also meet the needs of heating and cooling, its widely used in boilers, central air conditioning, industrial circulating cooling water system, hot water system.

 

1. The maximum opening diameter should be consistent with GB150-98 "steel pressure vessel" the relevant provisions.
2. The length of the determination, according to the process design required to take over the diameter, quantity and order to look up the table, select the adjacent nozzle center distance calculation set the total length of the water separator.
3. The selection should pay special attention to the diameter of the cylinder DN400mm, in the arrangements to take over, as far as possible the largest steam connector from the center of the head to remove the cylinder load and ease of installation and maintenance.
4. Each loop heating pipe into the outlet, respectively, should be connected with the water separator, catchment. The diameter of the water separator and the water collector should not be less than the total supply and return pipe diameter, and the maximum cross section of the water separator and water collector should not be greater than 0.8m / s. Each branch loop should be provided on the return pipe to close the valve.
5. In the water before the water pipe connected to the pipeline, along the flow direction should be installed valves, filters and drain pipes. In the backwater connection pipe after the sump, install the drain pipe and install the balance valve or other closing valve. The heat metering device shall be provided for the system with heat metering requirements.

 
2. Definition

 

The water dispenser is a combination of water dispenser and water dispenser. The water dispenser is a device that disperses all the way into a few outputs, and the water collector is a device that brings together the incoming water. The structure consists of the main pipe, the branch pipe, the sewage outfall, the exhaust port, the pressure gauge, the thermometer and so on. The larger diameter cylinder is equipped with manholes or hand holes. The material is made of carbon steel plate or seamless steel pipe. Bear a certain pressure, are specialized in the manufacture of pressure vessels, the outer surface to do anti-corrosion or insulation treatment. Set the water separator on the cylinder according to the need to connect a number of access to the water pipe, the water can be pooled or a way of water flow, the cylinder is equipped with a pressure gauge or thermometer, can easily observe the tube flow state. The lower end of the cylinder is equipped with an outflow port, and the effluent is used to clean the cylinder, and the model is mostly DN2000-DN1500. It is the first side of the main pipe water flow distribution as needed to ensure that the regional branch loop flow to meet the load needs, but also the flow of the branch circuit pool, and input back to the main pipe to achieve the cycle of operation. Its backwater reuse, can achieve more energy-efficient effect, can also meet the needs of heating and cooling, its widely used in boilers, central air conditioning, industrial circulating cooling water system, hot water system. It is different from the heat exchanger unit, vacuum degasser and other air conditioning systems inside the product, sub-catchment is mainly used for water systems.

 

3. Technological Innovation

 

1. In strict accordance with the national standard Atlas "05K232 sub-syster sub-cylinder" design, cylinder wall thickness to meet the requirements.
2. According to the actual use of the situation, optimize the pressure gauge and thermometer interface, easy to install and use, accurate temperature measurement.
3. According to each take over the flange, the choice of butterfly valve flange or flat welding flange to ensure that the flange and the corresponding valve matching, flange and valve contact area, high strength, less leakage.
4. All welding interfaces are polished smooth, the factory pressure test over the national standard to ensure stable operation.
5. Before leaving the factory to do water pressure test to ensure that the use of the product without leakage.
6. According to user needs to set the size of the water separator to ensure the use of results.

 

4. Calculation

 

1. The diameter of the cylinder than the size of the main pipe more than two.
2. The general flow rate can be calculated through the cylinder, the water flow rate is generally taken 0.1m / s ------ 1.0m / s.
3. The length of the cylinder L according to the number of takeover, diameter, tube spacing to calculate,
L = 130 + L1 + L2 + L3 + Li + 120 + 2h
When the cylinder needs insulation, l = d1 + d2 + 120
Cylinder does not need to heat when l = d1 + d2 +80
4. The pipe on the hydrophobic pipe and the direction of the sewage pipe by the engineering design decision.

 

5. Our Advantages
 
1. 30 years manufacturing experience for high quality
2. A strong R & D team, 70 senior engineers can quickly offer drawing according to your requirements.
3.18 years famous brand, the world famous enterprises are looking for our air storage tank
4. AMSE, CE certificate has been adopted
5. 100 % quality inspection before shipping .more than 40 inspectors
6. Manufactured using high quality carbon steel.
 
6. Our customer :
BAOSTEEL, TOSHIBA, CONCH, SPC, DAS AUTO, CHINA SHENHUA, HONGTA GROUP, FOXCONN,
BMW, CSIC, WALT DISNEY, BOSCH, ANSTEEL, SINOMA, etc.
 

Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment 0Industrial Heat Exchanger Equipment , Air Conditioning Heat Transfer Equipment 1
 


 

Contact Details
Shanghai Fengxian Equipment Vessel Factory

Contact Person: Lisa Lee

Send your inquiry directly to us
Other Products